I-89 SB over NORTH HOMINY POT RD

0.6MI FROM NEW LONDON TL. · County 013, New Hampshire · Built 1967 · 2 Lanes · 9,388 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
025000840016000
Year Built
1967
Reconstructed
1988
Length
15 m (49.2 ft)
Max Span
13.5 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
9,388
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.