I-89 NB over NH114

1.9MI NEW LONDON T.L. · County 013, New Hampshire · Built 1967 · 2 Lanes · 9,399 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
025001090014500
Year Built
1967
Reconstructed
1987
Length
36.9 m (121.1 ft)
Max Span
15.2 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
9,399
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.