I-89 SB over GILE POND ROAD

3.8MI NEW LONDON T.L. · County 013, New Hampshire · Built 1967 · 2 Lanes · 9,452 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
025001290011600
Year Built
1967
Length
17.4 m (57.1 ft)
Max Span
15.2 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
9,452
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.