MAIN STREET over SUGAR RIVER

115 FT FROM GARNETT ST · County 019, New Hampshire · Built 1920 · 2 Lanes · 2,301 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
024701110009900
Year Built
1920
Reconstructed
1992
Length
9.1 m (29.9 ft)
Max Span
8.5 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
2,301
Material
Wood or Timber
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.