HIGH STREET over SUGAR RIVER

0.3 MI. RTE.103B · County 019, New Hampshire · Built 1920 · 2 Lanes · 505 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
024701080009900
Year Built
1920
Reconstructed
2006
Length
8.2 m (26.9 ft)
Max Span
7.3 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
505
Material
Wood or Timber
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.