NH 11 over SUGAR RIVER

4.0 MI NEW LONDON TL · County 019, New Hampshire · Built 1957 · 2 Lanes · 7,207 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
024701030010000
Year Built
1957
Length
24.1 m (79.1 ft)
Max Span
21.3 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
7,207
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.