LOWER MAIN STREET over SUGAR RIVER

0.3 MI FR NH RTE 11 · County 019, New Hampshire · Built 1900 · 2 Lanes · 557 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
024700940010000
Year Built
1900
Reconstructed
2016
Length
7.8 m (25.6 ft)
Max Span
7.2 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
557
Material
Wood or Timber
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.