JEWELL STREET over POWWOW RIVER

.18 MI. FROM MASS. SL · County 015, New Hampshire · Built 1960 · 2 Lanes · 1,118 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
023801010006600
Year Built
1960
Length
9.1 m (29.9 ft)
Max Span
7.9 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
1,118
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.