WHITEHALL ROAD over POWWOW RIVER

0.8 MI FR MASS SL · County 015, New Hampshire · Built 1976 · 2 Lanes · 586 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
023800990006200
Year Built
1976
Length
10.1 m (33.1 ft)
Max Span
7.3 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
586
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.