NH 1A over SEAVEY CREEK

1.6 MI FROM JCT RTE 1B · County 015, New Hampshire · Built 2009 · 2 Lanes · 1,042 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
022602520015600
Year Built
2009
Length
49.4 m (162.1 ft)
Max Span
48.5 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
1,042
Material
Wood or Timber
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.