NH 1A over SAGAMORE CREEK

0.4 mi from RYE TL · County 015, New Hampshire · Built 2015 · 2 Lanes · 6,704 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
021701980003400
Year Built
2015
Length
129.2 m (423.9 ft)
Max Span
54.3 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
6,704
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.