US 1 SCOTT AVENUE over DANIEL STREET

0.1 MI SOUTH MAINE-NH SL · County 015, New Hampshire · Built 1921 · 2 Lanes · 14,207 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
021702460008300
Year Built
1921
Reconstructed
2013
Length
40.6 m (133.2 ft)
Max Span
21.3 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
14,207
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.