NH 1A over PARSONS CREEK

4.0 MI FROM N HAMPTON TL · County 015, New Hampshire · Built 1986 · 2 Lanes · 1,938 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
022601940009200
Year Built
1986
Length
13.4 m (44 ft)
Max Span
12.8 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
1,938
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.