NH 25 NH 3A over BAKER RIVER

2.7 MI RUMNEY TL · County 009, New Hampshire · Built 1968 · 2 Lanes · 13,729 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
021601170014300
Year Built
1968
Reconstructed
2011
Length
78.9 m (258.9 ft)
Max Span
29.9 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
13,729
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.