I-93 NB over NHRR

0.3 MI HOLDERNESS TL · County 009, New Hampshire · Built 1964 · 2 Lanes · 11,461 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
021601460014600
Year Built
1964
Reconstructed
1993
Length
43.3 m (142.1 ft)
Max Span
16.5 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
11,461
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.