I-93 SB over PEMIGEWASSET RIVER

HOLDERNESS-PLYMOUTH TL · County 009, New Hampshire · Built 1964 · 3 Lanes · 11,571 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

43.766178, -71.680828

This bridge is in worse condition than 17.9% of bridges in County 009. The average bridge in New Hampshire is 0 years old; this one is 62 years old.

Nearby Bridges

Bridge Details

Structure #
021601460014000
Year Built
1964
Reconstructed
1994
Length
129.5 m (424.9 ft)
Max Span
48.8 m
Width
17 m (55.8 ft)
Lanes
3
Daily Traffic
11,571
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.