NH175A over PEMIGEWASSET RIVER

0.1 MI E JCT US 3 · County 009, New Hampshire · Built 2006 · 3 Lanes · 7,661 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

43.759942, -71.685089

This bridge is in worse condition than 17.9% of bridges in County 009. The average bridge in New Hampshire is 0 years old; this one is 20 years old.

Nearby Bridges

Bridge Details

Structure #
012600460013900
Year Built
2006
Length
111.4 m (365.5 ft)
Max Span
39.6 m
Width
19.7 m (64.6 ft)
Lanes
3
Daily Traffic
7,661
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.