RESERVOIR ROAD over CLAY BROOK

.5 M F NEW HEBRON RD · County 009, New Hampshire · Built 2007 · 2 Lanes · 442 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
021600990012700
Year Built
2007
Length
7.9 m (25.9 ft)
Max Span
7.3 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
442
Material
Concrete
Design
Frame (except frame culverts)
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.