OLD NH 11 over MERRYMEETING RIVER

0.2 MI SE ALTON TL · County 017, New Hampshire · Built 1926 · 2 Lanes · 662 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
018201990005400
Year Built
1926
Length
7.3 m (24 ft)
Max Span
6.1 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
662
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.