SPRING STREET over COCHECO RIVER
1.38MI RTE 11 · County 017, New Hampshire · Built 1926 · 2 Lanes · 770 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
43.393222, -71.078675
This bridge is in worse condition than 90.4% of bridges in County 017. The average bridge in New Hampshire is 0 years old; this one is 100 years old.
Nearby Bridges
NH 11 over MAD RIVER
Built 1955
NH 75 over MAD RIVER
Built 1900
NH 75 CENTRAL ST over COCHECO RIVER
Built 1985
NH153 over COCHECO RIVER
Built 2018
SPRING STREET over ELA RIVER
Built 1998
RIVER ROAD over MAD RIVER
Built 1986
MILTON ROAD over DAMES BROOK
Built 2002
COCHECO ROAD over COCHECO RIVER
Built 1953
DAVIS CROSSING RD over ELA RIVER
Built 2010
NH 16 SP TPK over NH 75
Built 1980
Bridge Details
- Structure #
- 008400760013500
- Year Built
- 1926
- Length
- 11.9 m (39 ft)
- Max Span
- 11 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 770
- Material
- Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.