NH 11 over MAD RIVER

1.7 MI NEW DURHAM TL · County 017, New Hampshire · Built 1955 · 2 Lanes · 12,121 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
008400800012500
Year Built
1955
Length
11.6 m (38.1 ft)
Max Span
10.7 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
12,121
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.