MILTON ROAD over DAMES BROOK
0.60MI NE JCT NH153 · County 017, New Hampshire · Built 2002 · 2 Lanes · 96 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
43.408089, -71.057142
This bridge is in worse condition than 9.6% of bridges in County 017. The average bridge in New Hampshire is 0 years old; this one is 24 years old.
Nearby Bridges
NH153 over COCHECO RIVER
Built 2018
SPRING STREET over COCHECO RIVER
Built 1926
NH 75 CENTRAL ST over COCHECO RIVER
Built 1985
NH 75 over MAD RIVER
Built 1900
NH 11 over MAD RIVER
Built 1955
SPRING STREET over ELA RIVER
Built 1998
COCHECO ROAD over COCHECO RIVER
Built 1953
NH 16 SP TPK over SILVER STREET
Built 1980
NH 16 SP TPK over NH 75
Built 1980
RIVER ROAD over MAD RIVER
Built 1986
Bridge Details
- Structure #
- 008400810016400
- Year Built
- 2002
- Length
- 6.7 m (22 ft)
- Max Span
- 6.1 m
- Width
- 9.5 m (31.2 ft)
- Lanes
- 2
- Daily Traffic
- 96
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.