MILTON ROAD over DAMES BROOK

0.60MI NE JCT NH153 · County 017, New Hampshire · Built 2002 · 2 Lanes · 96 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
008400810016400
Year Built
2002
Length
6.7 m (22 ft)
Max Span
6.1 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
96
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.