NH 16 SP TPK over SILVER STREET

3.5 MI N OF ROCHESTER TL · County 017, New Hampshire · Built 1980 · 3 Lanes · 14,518 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
017301870010900
Year Built
1980
Length
28 m (91.9 ft)
Max Span
26.5 m
Width
16.1 m (52.8 ft)
Lanes
3
Daily Traffic
14,518
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.