NH 75 over NHNCRR

2.7 MI N OF FARMINGTON TL · County 017, New Hampshire · Built 1978 · 2 Lanes · 3,708 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
017302190012400
Year Built
1978
Length
21.3 m (69.9 ft)
Max Span
19.8 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
3,708
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.