NH125 over NHNCRR

1.9 MI FROM ROCHESTER TL · County 017, New Hampshire · Built 1954 · 2 Lanes · 5,656 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
017302120012800
Year Built
1954
Reconstructed
2011
Length
46 m (150.9 ft)
Max Span
16.5 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
5,656
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.