NH 11 over MERRYMEETING RIVER

8.5 MI FROM GILFORD TL · County 001, New Hampshire · Built 1934 · 2 Lanes · 10,346 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
000601630018400
Year Built
1934
Length
10.7 m (35.1 ft)
Max Span
9.1 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
10,346
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.