NH 28 over MERRYMEETING RIVER

4.7 MI FROM BARNSTEAD TL · County 001, New Hampshire · Built 2009 · 2 Lanes · 7,487 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000601860015500
Year Built
2009
Length
13 m (42.7 ft)
Max Span
12.2 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
7,487
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000