I-293 FEE TPK over I-293 NB ON RAMP
.6 MI BEDFORD TL · County 011, New Hampshire · Built 2016 · 5 Lanes · 63,919 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
42.975714, -71.472464
This bridge is in worse condition than 27% of bridges in County 011. The average bridge in New Hampshire is 0 years old; this one is 10 years old.
Nearby Bridges
I-293 FEE TPK over S BR PISCATAQUOG RIVER
Built 2016
I-293 FEE TPK RAMP over S BR PISCATAQUOG RIVER
Built 1957
US 3 NH 3A over I-293 NH 3A CSX MERR R
Built 1923
SECOND STREET over PISCATAQUOG (SOUTH BR)
Built 1991
I-293 FEE TPK over N BR PISCATAQUOG RIVER
Built 2016
SECOND STREET over PISCATAQUOG (NORTH BR)
Built 1915
I-293 NB OFF RAMP over I-293 NH 3A FEE TPK
Built 2016
NH 3A SO MAIN ST over PISCATAQUOG RIVER
Built 1894
US 3 ELM ST over CSX(ABD)
Built 1915
I-293 NB OFF RAMP over MERRIMACK RIVER
Built 1983
Bridge Details
- Structure #
- 016101490006200
- Year Built
- 2016
- Length
- 21.3 m (69.9 ft)
- Max Span
- 19.2 m
- Width
- 31.4 m (103 ft)
- Lanes
- 5
- Daily Traffic
- 63,919
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.