I-293 FEE TPK over S BR PISCATAQUOG RIVER

.8 MI BEDFORD TL · County 011, New Hampshire · Built 2016 · 6 Lanes · 63,919 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
016101450006500
Year Built
2016
Length
60.8 m (199.5 ft)
Max Span
58.8 m
Width
30.8 m (101 ft)
Lanes
6
Daily Traffic
63,919
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.