I-293 FEE TPK RAMP over S BR PISCATAQUOG RIVER

0.7 MI BEDFORD T.L. · County 011, New Hampshire · Built 1957 · 1 Lanes · 5,245 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
016101460006500
Year Built
1957
Reconstructed
2016
Length
65.5 m (214.9 ft)
Max Span
24.4 m
Width
7 m (23 ft)
Lanes
1
Daily Traffic
5,245
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.