I-293 FEE TPK over N BR PISCATAQUOG RIVER
.3 MI SECOND ST · County 011, New Hampshire · Built 2016 · 6 Lanes · 69,164 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
42.977986, -71.471133
This bridge is in worse condition than 17.7% of bridges in County 011. The average bridge in New Hampshire is 0 years old; this one is 10 years old.
Nearby Bridges
SECOND STREET over PISCATAQUOG (NORTH BR)
Built 1915
I-293 FEE TPK over S BR PISCATAQUOG RIVER
Built 2016
I-293 FEE TPK RAMP over S BR PISCATAQUOG RIVER
Built 1957
SECOND STREET over PISCATAQUOG (SOUTH BR)
Built 1991
NH 3A SO MAIN ST over PISCATAQUOG RIVER
Built 1894
I-293 FEE TPK over I-293 NB ON RAMP
Built 2016
US 3 NH 3A over I-293 NH 3A CSX MERR R
Built 1923
I-293 NB OFF RAMP over I-293 NH 3A FEE TPK
Built 2016
US 3 ELM ST over CSX(ABD)
Built 1915
I-293 NB OFF RAMP over MERRIMACK RIVER
Built 1983
Bridge Details
- Structure #
- 016101430006600
- Year Built
- 2016
- Length
- 41.1 m (134.8 ft)
- Max Span
- 38.1 m
- Width
- 34.4 m (112.9 ft)
- Lanes
- 6
- Daily Traffic
- 69,164
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.