MECHANIC STREET over ISRAEL RIVER

0.3 MI FROM US RTE 3 · County 007, New Hampshire · Built 1862 · 2 Lanes · 750 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
014101340010700
Year Built
1862
Reconstructed
2006
Length
28.7 m (94.2 ft)
Max Span
24.4 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
750
Material
Wood or Timber
Design
Truss - Thru
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.