US 2 over ISRAEL RIVER

0.4 MI E LANCASTER TL · County 007, New Hampshire · Built 1974 · 2 Lanes · 2,467 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
013500460017800
Year Built
1974
Reconstructed
2016
Length
50 m (164 ft)
Max Span
24.4 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
2,467
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.