NH116 over ISRAEL RIVER

1.2 MI SW JCT US 2 · County 007, New Hampshire · Built 1987 · 2 Lanes · 996 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
013500720013000
Year Built
1987
Length
29 m (95.1 ft)
Max Span
27.4 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
996
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.