NH115A over ISRAEL RIVER

2.4 MI SW JCT US 2 · County 007, New Hampshire · Built 1973 · 2 Lanes · 724 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
013500870009600
Year Built
1973
Reconstructed
2011
Length
25.6 m (84 ft)
Max Span
24.4 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
724
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.