NH115 over CHERRY MILL BROOK

2.9 MI SW JCT US RT 2 · County 007, New Hampshire · Built 1984 · 2 Lanes · 3,231 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
013500990005900
Year Built
1984
Length
11 m (36.1 ft)
Max Span
9.8 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
3,231
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.