US 2 US 3 over ISRAEL RIVER

4.6 MI FROM WHITEFIELD TL · County 007, New Hampshire · Built 1990 · 2 Lanes · 9,175 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
014101300011000
Year Built
1990
Length
41.5 m (136.2 ft)
Max Span
40.2 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
9,175
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.