US 2 over CONNECTICUT RIVER

AT VERMONT STATE LINE · County 007, New Hampshire · Built 2020 · 2 Lanes · 3,840 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
014101120013000
Year Built
2020
Length
124.4 m (408.1 ft)
Max Span
61 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
3,840
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.