BOYS CAMP ROAD over BICKNELL BROOK

.9 MI FR NH RTE 4A · County 009, New Hampshire · Built 1947 · 1 Lanes · 96 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
007701720011200
Year Built
1947
Reconstructed
2016
Length
9.8 m (32.2 ft)
Max Span
9.1 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
96
Material
Wood or Timber
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.