US 4 over CRYSTAL LAKE BROOK

0.6 MI FROM ENFIELD TL · County 009, New Hampshire · Built 1941 · 2 Lanes · 7,633 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
003600960003900
Year Built
1941
Reconstructed
1993
Length
23.2 m (76.1 ft)
Max Span
7.9 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
7,633
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.