MAIN STREET over MASCOMA RIVER

.3 MI. SW FROM INV RTE 40 · County 009, New Hampshire · Built 1954 · 2 Lanes · 1,358 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
007700790015300
Year Built
1954
Reconstructed
2004
Length
28 m (91.9 ft)
Max Span
13.4 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
1,358
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.