US 4 over MASCOMA RIVER

3.0 MI FROM ENFIELD TL · County 009, New Hampshire · Built 2004 · 2 Lanes · 6,887 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
003601370006200
Year Built
2004
Length
20.4 m (66.9 ft)
Max Span
19.9 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
6,887
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.