US 4 over MASCOMA RIVER

1.2 MI FROM ENFIELD T.L. · County 009, New Hampshire · Built 1965 · 2 Lanes · 7,633 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
003601030004900
Year Built
1965
Reconstructed
2016
Length
35.7 m (117.1 ft)
Max Span
17.1 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
7,633
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.