I-89 NH 10 SB over I-89 RAMP

0.1 MI ENFIELD TL · County 019, New Hampshire · Built 1959 · 2 Lanes · 10,987 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
010001020017400
Year Built
1959
Reconstructed
2016
Length
18.9 m (62 ft)
Max Span
16.5 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
10,987
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.