I-89 NH 10 NB over SMITH POND ROAD
2.2 MI GRANTHAM T.L. · County 009, New Hampshire · Built 1959 · 2 Lanes · 11,864 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
43.597278, -72.165489
This bridge is in worse condition than 52.3% of bridges in County 009. The average bridge in New Hampshire is 0 years old; this one is 67 years old.
Nearby Bridges
I-89 NH 10 SB over SMITH POND ROAD
Built 1959
I-89 NH 10 over BROOK ATV TRAIL
Built 1959
EASTMAN HILL ROAD over I-89 NH 10
Built 1961
I-89 NH 10 SB over I-89 RAMP
Built 1959
I-89 NH 10 NB over I-89 RAMP
Built 1972
MAIN STREET over MASCOMA LAKE
Built 2012
GREAT BROOK ROAD over GREAT BROOK
Built 1936
NH120 over GREAT BROOK
Built 1930
MAIN STREET over MASCOMA RIVER
Built 2003
MAIN STREET over MASCOMA RIVER
Built 1954
Bridge Details
- Structure #
- 007700890008900
- Year Built
- 1959
- Reconstructed
- 1973
- Length
- 20.9 m (68.6 ft)
- Max Span
- 18.3 m
- Width
- 13.6 m (44.6 ft)
- Lanes
- 2
- Daily Traffic
- 11,864
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.