EASTMAN HILL ROAD over I-89 NH 10

0.2 MI LEBANON T.L. · County 009, New Hampshire · Built 1961 · 2 Lanes · 2,191 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
007700600009700
Year Built
1961
Reconstructed
1993
Length
56.7 m (186 ft)
Max Span
17.7 m
Width
18.4 m (60.4 ft)
Lanes
2
Daily Traffic
2,191
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.