NH120 over GREAT BROOK

2.2 MI FROM PLAINFIELD TL · County 009, New Hampshire · Built 1944 · 2 Lanes · 2,671 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
014401500008400
Year Built
1944
Reconstructed
1993
Length
9.4 m (30.8 ft)
Max Span
8.5 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
2,671
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.