I-89 NB over NH 10

4.9 MI FROM SPRINGFIELD T · County 019, New Hampshire · Built 1959 · 2 Lanes · 10,804 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
010001100013800
Year Built
1959
Reconstructed
1973
Length
24.7 m (81 ft)
Max Span
23.2 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
10,804
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.