NH153 over OSSIPEE RIVER

0.1 MI N JCT RTE 25 · County 003, New Hampshire · Built 1956 · 2 Lanes · 3,594 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
007401100019000
Year Built
1956
Reconstructed
2001
Length
73.7 m (241.8 ft)
Max Span
25.6 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
3,594
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000