NH 25 over OSSIPEE RIVER

3.1 MI FROM OSSIPEE T.L. · County 003, New Hampshire · Built 2004 · 2 Lanes · 2,854 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
007401360018400
Year Built
2004
Length
160 m (524.9 ft)
Max Span
63.4 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
2,854
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.